Sasukepedia Wiki
Advertisement

Not to be confused with X-Bridge.

X Bridge (エックスブリッジ) was an obstacle introduced in KUNOICHI 2017 Spring's RED Stage (First Stage) as the fourth obstacle. While sharing the same name as X-Bridge albeit with spelling differences using the official title, this obstacle was more similar like Floating Tiles, where competitors have to walk from tile to tile, without falling and/or stepping on the red support ropes, as it will result in disqualification.

However, no one failed this obstacle, which can be due to the pads being significantly wider than the ones used for Floating Tiles, to the point where most competitors were able to walk in a straight line when attempting the obstacle, probably the reason it was replaced by Shaking Bridge in KUNOICHI 2017 Summer.

Takemoto Keiko attempting X Bridge
in KUNOICHI 2017 Spring


Competitors' Success Rate

  • All results based on the TBS broadcast and external information found.
KUNOICHI Clears Attempts Percentage
2017 Spring 14 14 100%
Total 14 14 100%


Advertisement